Three add-ons for the work around the code.
A pipeline to ship through, a design to build from, and tests that keep it all working. Each add-on joins a lab’s sprint at a flat price, agreed with the scope before the sprint starts, and works on that scope.
DevOps: Shipping should be the boring part.
Pipelines, cloud infrastructure and monitoring, built in the same sprint as the code that depends on them, so a deploy stops being an event and problems surface before your users report them.
- ›Deploys are manual, or amount to pushing to main and hoping.
- ›You are scaling on infrastructure that was not built for it.
- ›Environment problems eat the time meant for testing.
- ›Technical due diligence is coming and the infrastructure has to look mature.
- –You already have a strong DevOps engineer in-house.
- –You need 24/7 on-call cover. This add-on builds the systems; it does not staff a rota.
UI/UX: Designed and built by the same sprint.
User flows, design systems and interfaces, drawn alongside the engineers who build them, so what ships is what was designed and nothing is lost in a handoff.
- ›The product still looks like the MVP, and it is costing you enterprise deals.
- ›You want a design system that scales, not a folder of static screens.
- ›Designs keep getting lost on the way to code.
- ›You want one team to design and build, with nothing to translate in between.
- –You need brand identity. Logo and positioning come before this work.
- –You want designs to hand to your own developers. This add-on works inside a lab sprint.
QA & Testing: Catch it in CI, not in a support ticket.
Every lab sprint already gets release checks from its fractional QA. This add-on builds a suite you keep: automated tests and quality gates that run in your CI on every change, long after the sprint ends.
- ›You ship fast and things break in production.
- ›You have developers but nobody dedicated to QA.
- ›A funding round is coming and you need to show technical maturity.
- ›Enterprise buyers are asking how you test.
- –You are pre-MVP. Test coverage at that stage is premature.
- –You want manual testing only. This add-on is automation first.
Asked about add-ons
Name the add-on on the scoping call.
We agree it with the sprint’s scope and price before anything starts, and nothing is billed until then. The first 14 days are on us.